Salt Lake City, UT

Sugar Flats

A fire damaged the roof over Sugar Flats, a 171-unit occupied community in Salt Lake City. The roof was inspected, slope-verified and replaced with a 60-mil TPO system in about three weeks while residents stayed home.

Year
2024
Scope
TPO replacement
01 / 07
No items found.
The project

What the owner needed.

The brief

A fire damaged the roofing system over an occupied 171-unit community. The owner needed the damage dealt with and a roof that would keep water out for the long term.

The challenge

Replacing the membrane alone was not enough. The roof needed a full diagnostic inspection and slope verification first, and residents stayed home the whole time.

Sugar FlatsSalt Lake City, UT
The system

Thermoplastic polyolefin.

White, reflective single-ply with heat-welded seams.

  • Assembly Versico VersiWeld 60-mil TPO
  • Warranty 15-year watertight
Gallery

On the roof.

3 more photos from the job. Open one to see it larger.

No items found.
Work performed

What we did on this roof.

An occupied community after a fire: the roof had to be dried in fast and replaced without moving residents out.

Site noteFire-related roof work sits between reconstruction and roofing: the damage has to be documented and repaired, and the new assembly has to perform for years afterward.

Scope & budget

  • Diagnostic inspection
    The full roof was inspected after the fire so the damaged areas and the condition of the remaining assembly were documented before anything was priced.
  • Tear-off of the damaged roofing
    The fire-damaged roofing was removed so the new assembly went down on sound substrate.
  • 60-mil TPO assembly
    A Versico VersiWeld 60-mil TPO assembly was installed, matched to the existing substrates and self-performed by our own crews.

Scheduling & phasing

Quality & warranty

  • Slope verification
    Roof slope was checked across the building so the new system would drain and not hold water against the membrane.
  • Warranty closeout
    The finished roof was closed out with a 15-year watertight warranty.
The result

A watertight roof delivered in three weeks and on budget, with a 15-year watertight warranty and no disruption to residents.

Scope summary

  • Post-fire roof inspection and slope verification
  • Tear-off of damaged roofing
  • 60-mil TPO membrane system
  • Manufacturer-warranted closeout
On site

On the site.

No items found.
Project sheet

Want the full details on Sugar Flats?

Scope, duration, phasing and a reference contact are available on request for this project and anything else in the portfolio.

(866) 699-3360One number, every market
CallRequest a bid