Kennesaw Student Housing
A new student housing community in Kennesaw, Georgia, with several four-story buildings. TPO roof systems were installed as each building topped out.

What the owner needed.
The brief
Give a high-occupancy residential property durable, energy-efficient roofs from day one.
The challenge
Several buildings on a ground-up schedule, extensive rooftop mechanical equipment, and Georgia summer heat.

Thermoplastic polyolefin.
White, reflective single-ply with heat-welded seams.
What we did on this roof.
Keeping pace with the framing schedule across several buildings.
Site noteThe white membrane also helps manage heat through Georgia summers.
Scope & budget
- Insulation
Roof insulation was installed on each four-story building. - White TPO membranes
White TPO membranes were installed across every building.
Scheduling & phasing
- Roofed as each building topped out
Roofs went on building by building as the framing was completed, so interiors could start.
Quality & warranty
- Flashing and terminations
Flashing and terminations were detailed around every rooftop unit and penetration. - Edge metal
Edge metal was installed and detailed at the roof perimeters.
Watertight roofs on each building, turned over in step with the construction schedule.
Scope summary
- TPO roof systems
- Multiple new buildings
- Installed as each building topped out
- New-construction closeout
On the site.
Want the full details on Kennesaw Student Housing?
Scope, duration, phasing and a reference contact are available on request for this project and anything else in the portfolio.